WIND FARMS WANTED 100% FINANCING
NATIONAL AND INTERNATIONAL
TO QUALIFY;
A- The Wind Farm Project must be fully permitted, zoned and with government approvals if international.
B- (PPA) Power Purchase Agreements must be in place.
C- Investor will use the Windjet Turbines.
NOTE;
Existing wind farms are also considered.
Investor can JV-Power Purchase Agreements – Power Share Agreements
Expansion- Growth- Replace
We are now gearing up to make commitments and investments to projects that are contracted to deliver renewable energy via Power Purchase Agreement (PPA).
We are considering WIND FARM PROJECTS with varying financial levels and participation to take advantage of the enormous ROI that the Windjet will produce. The Windjet is a new generation of wind turbines that utilizes a rotor design vs. the traditional propeller design.
In evaluating the material going forward, it is important to understand the revenue stream and how a client will reach 100% ROI. What needs to be considered is the Rate for which is paid per Kilowatt (kw) via PPA, the average Wind speed, which will give the capacity or kw per hour, and the Capacity per hour of the turbine at the average wind speed. While this is a tremendous task we are looking to vet each project and mange everything from the site planning to manufacturing to the installation and connection and on to the revenue.
About the product, the turbines have various sizes from 4 meters in rotor size to a full size 30 meter unit which is a third of the size of the GE and Vestas units and has many times the out put per megawatt.
The units are also bird friendly as the spin in place and do not create the hazard to wildlife. There are many applications for these units and sizes that would apply to those locations and/or output.
For wind farm applications, estimate are that these units at 60 megawatts per acre vs. the conventional design which spaces the turbines about one acre apart.
The rotors on the turbine simulate a jet engine capturing the same air passing through each rotor and utilizing more surface area to acquire the same energy but utilizing more of it, this contributes to the enhanced capacity for this turbine.
In addition, there are several other patents and enhancements that will be utilizing a patented tower design with spaced frame technology that also is equipped with a HiJack system for raising and lowering equipment from the top of the tower to the ground.
This tower also has a telescoping ability that will work with the predictable weather sensors to enhance the output of the unit while also keeping the unit safe during turbulent weather.
The next highlight to the turbine is the hydraulic drive system, which uses multiple stacked generators, that allows to ratchet up the capacity in low wind speeds and ratchet down the capacity in high wind.
These generators are also located at the base of the tower for easy maintenance.
The patent for the hydraulic drive system also features the hydraulic accumulator system that stores hydraulic pressure in the accumulators to be time release as per our PPA thus giving a premium to managing power for the grid.
The window for generation for the Windjet is also a very impressive feature and starts from 1 MPH of wind speed to over 100 MPH plus.
The combination of these technologies to this NEW brand will give a more steady capacity and looking more like a coal fired utility to the grid.
This system also gives an advantage in the window of generating and is giving the ability to be the first “Smart Wind Farm” that can provide power to the grid when it’s needed not just when the wind blows.
Please submit;
The projects Executive Summary.
Proof of permits, zoning, government approvals etc.etc.
PPA
Please feel free to call my office
Thank you
Gregory
Leave a Reply
You must be logged in to post a comment.